Bulletins
Wellington Street Stair Rehabilitation – Ottawa Locks
Issued: March 05, 2020
Ends: April 30, 2020
Rehabilitation work on the staircase leading from Wellington Street down to the Ottawa Locks is now underway.
Work is expected to continue until April 30, 2020.
Access to the stairs will be closed for the duration of the rehabilitation. Pedestrians are asked to use the alternate staircase at Lawrence Freiman Lane.
- Date modified :