Dredge No. 4 was built during the summer and winter of 1912 for the Canadian Klondike Mining Company on Claim 112 Below Discovery on Bonanza Creek.  The largest wooden hull, bucket-line dredge in North America, it was designed by the Marion Steam Shovel Company.

Operational history

It commenced operations in May of 1913, and dug its way upstream in the Klondike Valley into what was known as the "Boyle Concession," sinking there in 1924. In 1927, it was refloated and continued to operate from the Klondike Valley to Hunker Creek. The ground at the mouth of Hunker Creek was so rich the dredge produced as much as 800 ounces of gold in a single day on Claim 67 Below. It operated until 1940. The dredge was rebuilt on Bonanza Creek by the Yukon Consolidated Gold Corporation and from 1941 to 1959 worked the Bonanza Creek valley. One of the two dozen dredges that worked this area, Dredge No. 4 rests on Claim No. 17 Below Discovery on Bonanza Creek near the spot where it ceased operations in 1960.

Gangplank and digging ladder of Dredge No. 4

Specifications

Dredge No. 4 is 2/3 the size of a football field and 8 stories high. It has a displacement weight of over 2,722 tonnes (3,000 tons), with a .45 cubic metre (16 cubic foot) bucket capacity. The dredge could dig 17 metres (48 feet) below water level, and 5 metres (17 feet) above water level using hydraulic monitors and washing the gravel banks down.

How it worked

The dredge was electrically powered from the Company's hydro plant on the Klondike River 48 kilometres (29 miles) away, requiring 920 continuous horsepower during the digging operation. Extra horsepower was needed occasionally for such things as hoisting the "spud" (pivot) and the gangplank.

The dredge moved along on a pond of its own making, digging gold bearing gravel in front, recovering the gold through the revolving screen washing plant, then depositing the gravel out the stacker at the rear. A dredge pond could be 91 metres (300 feet) by as much as 500 feet (152 metres) wide, depending on the width of the valley in which the dredge was working. The operating season was on average about 200 days, starting in late April or early May and operating 24 hours a day until late November.

The dredges were a very efficient means of mining for gold. The very fine flour gold however was very hard to save, as were nuggets too large to go through the 1 1/8 inch (1.9 centimetre) holes in the revolving screen, or those caught in the nugget catcher. These went up the stacker and out to the tailing piles.

National Historic Site

Commemorated as a National Historic Site, for years shipwrights have been working to restore and stabilize this amazing piece of Klondike history.

The Restoration of Dredge No. 4 (Video)