Peterborough, Ontario, June 20, 2016 - Construction of the new water control dam in Bolsover at Lock 37 is complete and site rehabilitation is underway. As a part of this work, Canal Road at the intersection of Simcoe Street in the Municipality of Ramara has been re-paved and is now re-opened to vehicle traffic.
The road had been closed to vehicular traffic to accommodate a staging area for construction.
Boat navigation will continue as normal throughout the 2016 navigation season, however the lock grounds will remain closed to the public while they are being restored.
Significant infrastructure investments are being made in our national historic sites, national parks and national marine conservation areas. When the replacement of the Bolsover Dam at Lock 37 was announced this project was the largest construction project that Parks Canada had undertaken in Eastern Canada in 25 years.
For up-to-date news on infrastructure work along the Trent Severn Waterway, please visit www.pc.gc.ca/TSWtalbotsimcoe or e-mail Ont.TrentSevern@pc.gc.ca.
Related links
- Boundary Road Swing Bridge
- Info-Work: Talbot dam maintenance
- Info-Work: Boundary Road Swing Bridge – Project Update
- Info-Work: Boundary Road Swing Bridge Construction Update
- Info-Work: Boundary Road Swing Bridge Construction Update
- Community Update: Dam at Lock 38 Construction Update
- Boundary Road Swing Bridge Construction Update
- Info-Work: Temporary Swing Bridge Closure
- Community Update: Dam Demolition to Begin
- Info-Work: Temporary Bridge Closure: Boundary Road Swing...
- Community Update: Conservation During Construction -...
- Community Update: Part 1 - The Dams
- Community Update: Update on Parks Canada Construction...
- Community Update: Talbot Area
- Community Update: Walleye and Chorus Frog Surveys Underway
- Community Update: Replacement of the Talbot Dam
- Community Update: Replacement of the Talbot Dam
- Community Update: Update on Parks Canada Construction...
- Community Update: Talbot Dam Replacement
- Info-Work: Temporary Closure of Boundary Road Swing Bridge
- Concrete Rehabilitation, Locks 39 - 41
- Date modified :